In only eight weeks, Carpi, a Freyssinet subsidiary specializing in waterproofing works, completed the waterproofing of the Larona hydropower inlet canal (three turbines with continuous power capacity of 165 megawatts). The canal is 7 km long, 14.4 m wide, with a maximum flow of 148 m³ per second.